
The prices are for labors only.
Plumbing | ||
Pipes | $50/ft. | Only through the 3rd party |
Bathroom Faucet | $80/each | Only through the 3rd party |
Kitchen Faucet | $100/each | Only through the 3rd party |
Electrical | ||
Outlet | $10/each | Only through the 3rd party |
Switch | $10/each | Only through the 3rd party |
Wire | $10/ft. | Only through the 3rd party |
Floor Tiles | $10/sq. ft. | Minimum $500 |
Wall Removal | $10/sq. ft. | Minimum $500 |
Wall Painting | $300/Gallon | Minimum $500 |
Hood Install | $120-$600 | |
Duct | $50/ft. | |
Appliance Hookup | $50-100 | |
Stove | $50-200 | |
Microwave | $50-150 | |
Refrigerator | $50-150 | |
Diskwasher | $150 | Only through the 3rd party |
Hardwood Floor | $3/sq. ft. | |
Laminate/Vinyl | $1.8-2.5/sq. ft. | |
Building Walls | $5/sq. ft. | |
Kitchen Remodel | $400/sq. ft. | including cabinets, countertops, flooring. |
Bathroom Remodel | Varies | |
Picking up or delivery | $100/trip |